BP BERAU LTD (2021)

Published on: 01 Jul 2026

BP BERAU LTD (2021) DETAILED ENGINEERING DESIGN OFFSHORE FLOWLINE INFILL WELLS PROJECT AT TANGGUH LNG FACILITIES • Construct flowline to connect each Xmas tree wing valve to existing VRA production manifold with single flowline • configuration for each well (no comingle). • Complete each flowline with its accessories such as wet gas flow meters, choke valve, non intrusive sand detector, sampling point, and through conduit double expanding gate valve (10” bel valve). • Connect the wells to VRA WHCP system.
← Back to Articles