PT PERTAMINA EP ZONA 9 (2023)

Published on: 01 Jul 2026

PT PERTAMINA EP ZONA 9 (2023) PEMBANGUNAN JETTY CREW BARU DI AREA MUARA FIELD SANGASANGA BIP Involvement – New Crew Jetty (Muara Field, Sangasanga) • Multidiscipline Engineering & Design (layout, structure, utilities) • Technical Studies: geotechnical, hydrodynamic, safety review • Preparation of Drawings, Specs, MTOs & Cost Estimate • Procurement & Construction Support (work packs, procedures) • Project Management & Documentation (schedule, reporting, EDMS)
← Back to Articles